Step 1: Guide sand from the top-left pile into the leftmost hole.
Draw a path starting from the top-left sand pile, extending diagonally down-right to the first visible platform. Then, from that platform, draw a path horizontally right and slightly down to connect to the next lower platform. Finally, from the second platform, draw a path diagonally down-left to guide the sand into the leftmost hole.
Sand from the top-left pile successfully flows into the leftmost hole. (approx. 00:11)



Share Your Experience
Community Comments (0)
No comments yet. Be the first to share your experience!