Step 1: Create the initial downward path from the funnel to the first rotating pipe.
Place an L-pipe, a straight pipe, and another L-pipe (moving clockwise) to direct sand from the top funnel towards the first rotating platform in the top-left.
Sand flows from the funnel into the top-left rotating pipe at 00:14.
Step 2: Extend the path from the first rotating pipe towards the loop entrance.
From the first rotating pipe, connect a straight pipe, an L-pipe, and another straight pipe to guide sand downwards and left, setting up for the main loop.
The sand path is clearly established to lead into the main loop structure by 00:15.
Step 3: Construct the main loop-de-loop section.
Form the loop by connecting a straight pipe, an L-pipe, and a long straight pipe in sequence, ensuring a continuous curve for the sand to flow through.
Sand successfully travels around the entire loop segment at 00:16.
Step 4: Connect the loop exit to the second rotating pipe.
From the loop's exit, place a short straight pipe and an L-pipe to guide the sand to the bottom-right rotating platform.
Sand flows smoothly from the loop into the bottom-right rotating pipe at 00:19.
Step 5: Direct the sand from the second rotating pipe to the collection bin.
Use a straight pipe and a final L-pipe to guide the sand from the bottom-right rotating platform directly into the collection bin.
All required sand collects in the bin, triggering 'LEVEL COMPLETED!' at 00:24.
경험 공유
커뮤니티 댓글 (0)
아직 댓글이 없습니다. 첫 번째로 경험을 공유해 보세요!