Step 1: Create the primary funnel path for the sand.
Draw a long, smooth line starting from the top-left sand source. Angle it downwards towards the right, aiming to guide the sand towards the general area above the collection container.
Most of the sand starts flowing along the drawn line, heading generally towards the container.






경험 공유
커뮤니티 댓글 (0)
아직 댓글이 없습니다. 첫 번째로 경험을 공유해 보세요!