Step 1: Direct the initial sand pour towards the first (leftmost) target bucket.
Immediately after the sand starts pouring (around 00:01), draw a diagonal line from the upper left side of the sand pile, extending downwards and slightly to the right, to channel a portion of the sand into the first bucket.
Sand begins to flow primarily into the first target bucket.
Step 2: Direct a portion of the remaining sand flow into the second target bucket.
As the main sand flow continues past the first channel (around 00:05), draw a second diagonal line to the right of the first, creating a new channel that guides sand into the second bucket.
Sand begins to flow into the second target bucket.
Step 3: Direct a portion of the remaining sand flow into the third target bucket.
Following the established pattern (around 00:08), draw a third diagonal line to the right of the second, opening a path for sand to enter the third bucket.
Sand begins to flow into the third target bucket.
Step 4: Direct the final portion of sand into the fourth (rightmost) target bucket.
Complete the series of channels (around 00:10) by drawing a fourth diagonal line to the right of the third, ensuring the last of the sand flows into the final bucket.
Sand begins to flow into the fourth target bucket, and all four buckets are simultaneously filling.
경험 공유
커뮤니티 댓글 (0)
아직 댓글이 없습니다. 첫 번째로 경험을 공유해 보세요!