Step 1: Establish initial sand flow towards the central area.
Draw a long, downward-sloping line starting from just below the sand dispenser and extending towards the right, ending on the existing central platform.
Sand begins flowing smoothly along the drawn line and collects on the central platform.
Step 2: Fill the leftmost truck.
Draw a curved line from the collected sand on the central platform, creating a chute that directs the sand directly into the leftmost truck.
Sand enters and fills the leftmost truck. The truck's fill meter reaches 100%.
Step 3: Fill the middle truck.
After the first truck is filled, draw a new line or extend an existing one to guide the remaining sand flow from the central platform into the middle truck.
Sand enters and fills the middle truck. The truck's fill meter reaches 100%.
Step 4: Fill the rightmost truck and complete the level.
Finally, draw a line to direct the last portion of sand from the central platform or previous flow into the rightmost truck.
Sand enters and fills the rightmost truck. All trucks are full, and the 'SUCCESS' screen appears.
경험 공유
커뮤니티 댓글 (0)
아직 댓글이 없습니다. 첫 번째로 경험을 공유해 보세요!