Step 1: Connect the starting pipe to the first U-turn segment.
Rotate the U-turn pipe segment at the top-left to face right, connecting it to the vertical starting pipe.
The U-turn pipe segment aligns and visually connects with the starting pipe.
Complete walkthrough and strategy guide for Sand Loop Level 355. Watch the video tutorial and learn expert tips to beat this level.

Watch this video walkthrough to learn how to beat Sand Loop Level 355. Follow the step-by-step solution.
Master Sand Loop Level 355 with our complete walkthrough. This expert level typically takes 8–15 min to complete. Find tips, video guides, and strategies for this puzzle level.
A step-by-step walkthrough demonstrating how to connect all pipe segments to guide the sand from the start to the target in Sand Loop.
| Time | Scene | Action | Common Error | Confidence |
|---|---|---|---|---|
| 00:00 | Initial puzzle layout | Player begins rotating pipe segments to form a path. | 100% | |
| 00:05 | Mid-left pipe section | Player rotates the first U-turn pipe segment. | 90% | |
| 00:15 | Bottom-left pipe section | Player rotates a vertical straight pipe segment. | 90% | |
| 00:25 | Bottom-right pipe section | Player rotates a U-turn pipe segment to connect to a horizontal straight pipe. | 90% | |
| 00:35 | Top-right pipe section | Player rotates the first T-junction pipe segment. | 90% | |
| 00:45 | Full puzzle view | All pipe segments are connected; player clicks 'START' button. | 100% | |
| 00:46 | Sand flowing through pipes | Sand begins to flow through the constructed path. | 100% | |
| 00:54 | Sand reaches target | The sand successfully reaches and fills the target receptacle. | 100% | |
| 00:55 | Level complete screen | The 'Level Complete' screen appears, signaling successful completion. | 100% |
Rotate the U-turn pipe segment at the top-left to face right, connecting it to the vertical starting pipe.
The U-turn pipe segment aligns and visually connects with the starting pipe.
Rotate the corner pipe segment directly below the U-turn so it connects upwards and right.
The corner pipe segment aligns and visually connects with the U-turn pipe.
Rotate the vertical straight pipe segment at the bottom-left to connect downwards from the corner pipe.
The vertical straight pipe segment aligns and visually connects.
Rotate the corner pipe segment to the right of the vertical straight pipe to connect upwards and right.
The corner pipe segment aligns and visually connects.
Rotate the U-turn pipe segment below and to the right of the previous corner pipe to connect left and upwards.
The U-turn pipe segment aligns and visually connects.
Rotate the horizontal straight pipe segment to the right of the U-turn pipe to connect to it.
The horizontal straight pipe segment aligns and visually connects.
Rotate the T-junction pipe segment above the horizontal straight pipe to connect downwards and also to the right.
The T-junction pipe segment aligns and visually connects.
Rotate the T-junction pipe segment near the top-right to connect leftwards to the previous T-junction and downwards to the target.
All pipe segments form a continuous, visually connected path from the sand source to the target.
Click the 'START' button.
Sand begins to flow through the constructed pipe system.
Q: How do I rotate the pipe segments in Sand Loop?
A: Tap or click on a pipe segment to rotate it clockwise until it aligns with other pipes to form a path.
Q: What happens if the sand doesn't flow correctly after I press start?
A: If the sand doesn't flow correctly, it means there's a break in the pipe connection. Re-check each segment to ensure they form a continuous path from the start to the target.

View Guide →

View Guide →

View Guide →

View Guide →

View Guide →

View Guide →

View Guide →

View Guide →

View Guide →

View Guide →

View Guide →

View Guide →
Share Your Experience
Community Comments (0)
No comments yet. Be the first to share your experience!